Gut renovate a over 2000 sf lot, upgrade Facade, lobby and stairways of a brown stone building .

Replace a 120 years old elevator in TriBeCa. The elevator upgrade needs to build a 7 story elevator concreted shaft and install a brand new elevator. To retrofit the elevator, with tenants. completed the project on time and within budget.